Imara Energy Projects
We have successfully completed an impressive variety of projects that have facilitated sustainable development in East and Southern Africa.
Salender Bridge
Diesel Supply
The new bridge is funded jointly by the government of South Korea at 82.9% of the entire cost, and the government of the Republic of Tanzania. It connects roads linking Aga Khan Hospital and Coco beach
- Total length: 1.4 kilometers
- Design life: Modern Bridge
- Crosses: Msimbazi delta
- Capacity: 180 Tonnage
- Ferry: 55,000 Vehicles
- Price tag: US$126.26 million


Busisi Bridge
Diesel Supply
Kigongo-Busisi Bridge spans part of Lake Victoria (Mwanza Gulf) replacing the ferry service and improving transport connections for the country’s Mwanza Region.
- Total length: 3.2 kilometers
- Price tag: US$265 million
- Connects: connecting Mwanza and Geita regions
- Constructors: China Civil Engineering Construction Group and the China Railway 15th Bureau Group
Ring Roads Temeke
Diesel Supply
Regional Road Construction Development Projects under the supervision of Temeke Council (478.4 km).
In collaboration with JAPAN (JICA), a comprehensive transport and transportation plan has been developed to promote the construction of infrastructure and various forms of transport and transportation until 2030.


Katavi Mpanda
Diesel Supply
A major road construction project; Mpanda-Inyonga-Sikonge-Tabora mainland 359 km tarmac road which received funding from the African Development Bank (ADB).
Divided into three parts; Usesula-Komanga 108 km, Road to support the town of Sikonge (Sikonge Spur) 2.21 km and the road to Sikonge town with a length of 7.36 km which is located in Tabora region.
Kibaha - Chalinze
Diesel Supply
The 103-kilometer construction of the six-lane road expansion from Dar – Chalinze:
The construction phase from Kimara to Kibaha 23 kilometers and Imara Energyfacilitated the construction of the 75 kilometers road extension phase from Kibaha to Chalinze.